Second Public Participation Announcement for the Research, Development, and Upgrade Project of Intelligent Drilling Rigs for Coal Mines by Shandong Xiangde Electromechanical Co., Ltd.

time:2024-10-10 | Source: Xiangde Electromechanical

The Environmental Impact Assessment Report (Draft for Comments) for the Research, Development, and Upgrade Project of Intelligent Drilling Rigs for Coal Mines by Shandong Xiangde Electromechanical Co., Ltd. has been completed. In accordance with the Environmental Impact Assessment Law of the People’s Republic of China, the Measures for Public Participation in Environmental Impact Assessment, and other relevant regulations for construction project environmental impact assessments, this announcement is made to disclose the project’s details and its environmental impact assessment. The purpose is to broadly gather public opinions and suggestions from all sectors of society regarding the project’s environmental protection aspects and to accept public supervision. Relevant information regarding the environmental impact assessment of this project is hereby announced as follows:

I. Project Overview

Project Name: Research, Development, and Upgrade Project of Intelligent Drilling Rigs for Coal Mines

Nature of Construction: Technical Renovation

Location: Located at No. 88 Keji Middle Road, Shanggao Street, Shandong Taishan Economic Development Zone (Core Area), within the West Factory Area of Shandong Xiangde Electromechanical Co., Ltd.

Project Summary: With a total investment of 12.35 million RMB, the project will be constructed within the existing factory area without changing the current machining capacity. Major additions include:

One shot blasting machine and supporting environmental protection facilities.

One automatic laser cutting machine and supporting environmental protection facilities.

Replacement of the original painting method to increase the spraying area for drilling rigs and add spraying for products such as drill rods, drill bits, and anchors. The painting room’s environmental protection facilities will be upgraded, and new exhaust gas treatment equipment featuring "Three-Stage Filtration + Zeolite Rotor Adsorption Concentration + Desorption + Catalytic Oxidation Combustion" will be installed.

Other public and auxiliary facilities will rely on existing infrastructure. The project has obtained the construction project filing certificate, with the project code: 2405-370902-07-02-520118.

II. Links to the Draft Report and Methods for Accessing the Paper Version

Link to the Draft Report for Comments: https://pan.quark.cn/s/f0c74656b6af

Extraction Code: Rhur

Paper Version Access: Available upon request from the construction unit. The review period is 10 days from the date of this announcement.

III. Network Link to the Public Opinion Form

Public Opinion Form Link: https://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html

IV. Scope of Public Consultation

The consultation targets residents potentially affected by the project, as well as relevant government agencies and enterprises/institutions in the surrounding area.

V. Methods and Channels for Submitting Public Opinions

The public may submit the public opinion form to the construction unit via mail or email within the specified timeframe.

VI. Construction Unit Name and Contact Information

Construction Unit: Shandong Xiangde Electromechanical Co., Ltd.

Contact Person: Manager Cheng

Telephone: 15053896960

VII. Environmental Impact Assessment Unit Name and Contact Information

Environmental Impact Assessment Unit: Shandong Meiling Zhonglian Environmental Engineering Co., Ltd.

Contact Person: Engineer Yu

Telephone: 15064388535