询盘
In accordance with other relevant regulations on environmental impact assessment, this notice is issued to publicize the construction situation and environmental impact assessment of this project, with the aim of facilitating a broad understanding of public attitudes from all sectors of society toward this project, as well as opinions and suggestions on environmental protection, and to accept public supervision. The relevant information regarding the environmental impact assessment of this project is hereby announced as follows:
I. Name and Overview of the Construction Project
Project Name: Research, Development, and Upgrading of Intelligent Drilling Rigs for Coal Mines;
Nature of Construction: Technical Renovation;
Address: Within the existing factory premises of Shandong Xiangde Electromechanical Co., Ltd.;
Project Overview: While maintaining the existing machining capacity unchanged, the project mainly includes the addition of one shot blasting machine and its supporting environmental protection facilities; one automatic laser cutting machine and its supporting environmental protection facilities; replacing the original painting method to increase the painting area of drilling rigs and adding painting for products such as drill rods, drill bits, and anchorages, renovating the environmental protection facilities of the painting booth, and adding exhaust gas treatment equipment featuring "three-stage filtration + zeolite rotor adsorption concentration + desorption + catalytic oxidation combustion."
II. Name and Contact Information of the Construction Unit
Construction Unit: Shandong Xiangde Electromechanical Co., Ltd.;
Contact Person: Cheng Wei
Contact Phone: 15053896960
III. Online Link to the Public Opinion Form
Online Link to the Public Opinion Form:
http://www.mee.gov.cn/xxgk2018/xxgk/xxgk01/201810/t20181024_665329.html.
IV. Evaluation Agency Responsible for the Environmental Impact Assessment
Environmental Impact Assessment Unit: Shandong Meiling Zhonglian Environmental Engineering Co., Ltd.
Mailing Address: No. 56 Qiling Road, Linzi District, Zibo City
Contact Person: Yu Gong
Contact Information: 15064388535
E-mail: 172125266@qq.com
V. Work Procedure and Main Content of the Environmental Impact Assessment
Environmental impact assessment procedure for this project: Based on the current environmental quality survey and analysis of pollution sources from the project and its surrounding area, the assessment will provide an evaluation conclusion on the environmental feasibility of the project and propose environmental protection measures and recommendations, taking into account the results of environmental impact predictions and public participation surveys.
Main tasks of the environmental impact assessment for this project: assessing the current environmental quality in the project area, analyzing regional pollution sources, predicting the environmental impacts during the construction and operation phases of the project, and proposing environmental protection countermeasures for potential impacts caused by the project.
VI. Main Issues for Public Opinion Solicitation
(1) Are you aware of/informed about the project being constructed in this area?
(2) Are you satisfied with the current quality of the surrounding environment?
(3) Impact of the project on local economic development after completion;
(4) Environmental impact during the project's construction period;
(5) Environmental impact after the project's completion;
(6) Your attitude toward the construction of this project;
(7) Any suggestions or requirements regarding the project construction.
VII. Methods and Channels for Soliciting Public Opinions
This public participation survey mainly involves downloading and filling out the "Public Opinion Form," and contacting the construction unit or the preparation unit by mail, email, or phone.
VIII. Main Methods for Submitting Public Opinions
Main methods for submitting public opinions: The public may express their views and opinions on the project construction and environmental impact assessment within 10 working days from the date of this announcement, and are requested to provide specific contact information. The environmental impact assessment unit will accurately record the public's opinions and suggestions in the project's "Environmental Impact Report" and reflect the valuable opinions and suggestions to the construction unit, design unit, and relevant departments of the project.
Shandong Xiangde Electromechanical Co., Ltd.
May 27, 2024

WeChat
Video account
Tik Tok Tel:+86-538-6599799
E-mail:xdjdgs2010@163.com
Address:Taishan Industrial Park, Taian, Shandong Province, China

Drilling Equipment Customization Expert
Video account
Tik Tok